CEPU Central Puerto S.A.
$10.34
Central Puerto S.A. Q3 F2027 Earnings Call Transcript
AI Conference Call Analysis
Sign in or subscribe to read.Operator
Conference Call Operator
Good morning, ladies and gentlemen. Welcome to Central Porto's third quarter of 2026 earnings conference call. A slide presentation is accompanied today's webcast and will be also available on the investor section of the company's website, www.centralporto.com slash EN slash investors. All participants will be in a listen-only mode during the presentation. After that, there will be an opportunity to ask questions. Please note this event is being recorded. If you do not have a copy of the press release, please refer to the investor relations support section on the company's corporate website at www.centralpuerto.com. In addition, a replay of today's call will be available in upcoming days by accessing the webcast link at the same section of the Central Puerto's website. Our host today will be Mr. Fernando Bonnet, Central Puerto's CEO, Mr. Enrique Terraneo, the company's CFO, Mrs. Maria Laura Feller, Head of Investor Relations, and Mr. Osvaldo Cadu, our Finance Manager, and Mr. Alejandro Dias Lopes, Head of Corporate Finance. Maria Laura, please, go ahead.
Maria Laura Feller
Head of Investor Relations
Good morning, everyone, and thank you for your time today. We'll cover our third quarter results, and then we will take your questions. As always, please keep in mind the disclaimer on slide two regarding forward-looking statements and non-IFRS measures, including adjusted EBITDA. Also, as a reminder, since January 1st of this year, our functional currency is the U.S. dollar rather than the Argentine peso, and we have refined how we convert historical peso figures into dollars. You'll find the full detail in note 2.2 to our financial statements. All figures are in U.S. dollars unless otherwise stated. Let's turn to slide 3 for the highlights of the quarter. Third quarter adjusted EBTA came in at 185.3 million dollars. That's up 27.8% from the $145.0 million achieved in the second quarter, and up 70.3% versus the $108.8 million in the third quarter of 2025. Achasti EBTA for the first nine months of the year reached $451.0 million, and our last 12 months Achasti EBTA stands at $480.3 million. Revenues total $532.4 million, up 17.4% quarter-on-quarter from $453.3 million, and up 157.6% year-on-year from $206.7 million. This figure includes $218.6 million of spot revenues related to self-procured fuel. Total generation reached 4,791 GWh, representing approximately 13.6% of total generation on Argentina's grid in the quarter. Our assets generation decreased 5.2% from the second quarter's 5,055 GWh and a 5.6% increase versus the 4,539 GWh generated in the third quarter of last year. Such effect was explained by program maintenance works in Central Puerto and Central Costanera assets. On the investment side, capital expenditures were $36.7 million in the quarter and $458.6 million for the first nine months of 2026. That includes a progress made during the quarter in our battery energy storage projects, which are expected to be completed in the following months, and maintenance works. Our balance sheet continues to show strength, with a net financial leverage of 0.72 times adjusted EBITDA from 1.2 times last quarter, with net financial debt of $343.7 million. On the commercial front, on October 1st, we signed the first direct natural gas supply agreement of its kind in the sector. Together with Plus Petrol, we became the first non-integrated companies to withdraw planned gas volumes from the Camesa pool. The agreement will run through December 2028, the end of the current planned gas program, for 2 million cubic meters per day, which represents approximately half of the gas needed for the average daily operations of the central Puerto complex. Briefly on the total market demand. In this quarter was 36.7 TWh, up 3.8% quarter-on-quarter and 4.1% year-on-year, driven mainly by residential demand, which grew 7.0% versus the second quarter. Also in this quarter, the generation mix shifted. Hydrogeneration increased 35.2% quarter-on-quarter on better hydrological conditions, while thermal generation declined 15.7%. Gas volumes under the Gas Acuerdo Program fell during the winter months and were compensated by fuels procured directly by generators. Regarding Central Puerto, our total generation was 4,791 GWh. Compared to the second quarter, we had lower thermal dispatch at some central puerto and central costanera assets which underwent scheduled maintenance and was partially offset by higher output at Brigadier López, San Lorenzo, Piedra del Águila and the renewables. Year on year, Piedra del Águila nearly doubled its output, up 93.6%, and Brigadier López added 371 GWh as its new combined cycle ramped up. Our renewables generated 469 GWh, up 8.4% quarter on quarter, with the Cafayate and San Carlos new solar farms Revenues were $532.4 million, up 17.4% quarter-on-quarter and 157.6% year-on-year. Energy sales were $509.5 million, representing 95.7% of the total. Spot thermal revenues were the main driver, reaching $289.8 million, up 35.0% quarter-on-quarter and 192.2% year-on-year. Such increase is explained by higher seasonal marginally system prices during the winter months and the fuel cost component that is reflected in revenues when we self-procure fuel for spot generation. In the third quarter, this included approximately $218.6 million of natural gas, LNG and liquid fuels purchased directly, compared to $182.8 million in the second quarter. When CAMESA supplies the fuel under the gas acuerdo program, that cost is managed by CAMESA and therefore is not recognized as revenue by the company. Contracted revenues total $219.7 million, and within that figure, thermal mat and PPA revenues were $167.3 million, renewables $29.8 million, and hydro $22.5 million. As pot revenues grew faster with self-procured fuel component, contracted revenues represented 43% of energy sales compared to 51% last quarter. Adjusted EBITDA was $185.3 million, up 27.8% quarter-on-quarter and 70.3% year-on-year, with a margin of 34.8% compared to 32.0% last quarter. Because our revenues now include the fuel cost component of self-procured fuel, margins are not directly comparable to last year. The improvement was mainly driven by the margin capture on self-procured fuels and seasonal winter spot prices, together with higher volumes from all three PPA thermal assets, including the new Brigadier-López combined cycle and from Piedra del Águila on better water resources. The solar farms we acquired, Cafayate and Build, San Carlos, in 2025 added further volume. Self-procured fuel reached 55.3% of our total fuel consumption in the third quarter, up from 37.2% in the second quarter and 18.1% in the first. That is an average of almost 4 million cubic meters per day of gas equivalent, out of 7.2 million in total. Our adjusted EBDI for the first nine months of the year was $451.0 million and we are on track to reach our full year guidance of $500 to $550 million. Capital expenditures for the quarter were $36.7 million and $458.6 million for the first nine months. Of that amount, $108.9 million correspond to the battery storage projects. Regarding such projects, all civil works are complete and the battery containers have been installed. Construction is 81% complete at Central Puerto and 87% at Central Costanera, and 82% of the total project CAPEX has already been executed. Our projects are expected to be the first to reach commercial operation among all the projects under the ALMA GBA and ALMA SADI programs. Once operational, we expect these projects to contribute between $25 and $27 million to our consolidated Achasti de Vidia in 2027. On oil and gas, we continue to work with the Neuquén provincial authorities on the CENCH process for the Aguada del Chivato and Aguada de Bocarey blocks, and we are preparing the documentation for our RIGI presentation. In addition, on October 21, the province awarded the Corralera Noroeste block to our subsidiary PESA. As of September 30, our total outstanding financial debt was $681.5 million. Against cash, cash equivalents and financial current assets of $337.8 million, that leaves us with net debt of $343.7 million. Additionally, our last 12 months adjusted EBITDA was $480.3 million, and that is how our net leverage ratio was 0.72 times the adjusted EBITDA. In the quarter, in July, we issued the Class E notes for $94.3 million, and after quarter end, on October 6, we issued the Class F notes for $50.0 million. Thank you very much for your time and for your continued confidence in Central Puerto. I will now hand over for the Q&A and then our CEO will share his closing remarks.
Operator
Conference Call Operator
Thank you very much for the presentation. We will now begin the Q&A section for investors and analysts. If you wish to ask a question, please press the button Raise Hand. Our first question comes from Guilherme Lima with Santander. You can open your microphone.
Guilherme Lima
Analyst, Santander
Good morning, guys. Thanks for the opportunity to ask a question. I have two quick questions here. First, if you could comment on the full year EBITDA expectations as you ruled in the earnings release, you were expecting around 500 US dollar and 550 million. I just wanted to understand What are your expectations for the fourth quarter comparing to the last year fourth quarter as last year the EBITDA was around... 100 million if I'm not mistaken. If you just could comment on what you are seeing for the last quarter of the year and your expectations for the full year EBITDA in 2026. And the other question is related to capital allocation. We saw a leverage decrease to around 0.7 times that up to EBITDA. If you could just comment on the opportunities you are seeing for this low level of leverage and if we should expect a recurring dividend for the 2027. That's it. Thank you.
Fernando Bonnet
Chief Executive Officer
Thank you for your question. Going to the first one, talking about the expectation of the projected GDPR, as you mentioned, we are seeing something around 500 and 550, depending on the dispatch of the units, the hydro levels, the inflows coming from the from the Cochoncura River and Divine River that are in the third quarter was very, very high. And we are seeing that they are reducing right now. And the consumption, the fuel consumption that we are not expecting liquid fuels for this final quarter. and the dispatchers of our units. So comparing to the last year, I think we'll be more or less similar. We have more contracts today, but on the other hand, we have a big maintenance, program maintenance in our Costanera combined cycle, more or less 60 days of maintenance, one GT and 30 days of maintenance on the other one. so the will be reduced that 100 that you mentioned would be perhaps between 75-80 million dollars and depending on the information of the of the inflows from Viedra El Águila for the inflows and the dispatch of the of the steam turbines that are very sensitive to the temperatures right now we are not We are seeing the dispatch of the TB6 and TB9 from Central Puerto that were out of dispatch since end of August. So we are right now seeing a ramp up of temperature. This could increase our EBITDA a little bit, depending, as I mentioned, on the temperature. So we can see in the range of 75, 80 million dollars, and could be 90 if the temperature goes up higher than we are seeing right now. Going to the second one, the leverage ratio. As you mentioned, we are reducing that for increasing of the ABTDA, so this gives you a full flexibility to enter a new acquisition. We are seeing opportunities on the selling the government assets, talking about the hydro and the thermal unit that the government is planning to sell, and other opportunities to acquire We are looking for an organic opportunity of growth. Talking about dividends, this will be the side of the shareholders' meeting. We are not seeing the best dimension. Depending on the growing opportunities, we will perhaps Our next question comes from Tomas Peruchin with Balance. You can open your microphone.
Tomas Peruchin
Analyst, Balance
Hi, good morning. Thank you for taking my questions. Congrats on the results. Regarding fuel self-procurement, we have seen that you are making progress with self-procurement. As we understand, to get an FRAV1 in the spot market, you also need firm gas transportation capacity. Do you think you will be able to secure enough firm transportation capacity to cover 100% of your thermal fleet? And regarding the plus petrol agreement, could you give us some color on the average price you are paying compared to the planned gas? Thanks.
Fernando Bonnet
Chief Executive Officer
Okay, going to the first question. Thank you for your question, going to the first one. I don't see easily to cover 100% of our gas capacity with clean transportation. Right now we have, we acquired transportation from TGS around 400 cubic meters and we expect to, and we are analyzing the opportunity to enter in the TGN new pipeline that goes for, mostly for the center of the county and the north. So we are analyzing that for the The San Lorenzo plant, the Piaver Lopez plant, and in some cases some for Buenos Aires area. But with the TGS and TGN, I think we could We benefit from the liberation of the transportation of Camisa that will come to us sooner or later. So I don't see the need to have 100% of our capacity contracted because the situation of the production of the combined cycle right now are not easy to predict. or are not, I think, wealthy to have 100% contracted with the prices that we are seeing of this transportation. But at the end of the day, I'm assuming that in the near future with DGS and DGN, we can at least reach the level of between 40% and 50% of our capacity, efficient thermal capacity contracting. And going to your second question, the price that we have with the Plus Petrol is the same price that Plus Petrol has with the plant gas, is between 2.7 and 4.1 depending on the dollars per million cubic meter and depending on winter time and summer time. It's the same price that Justo Pedro has for the flangas.
Tomas Peruchin
Analyst, Balance
Okay, very clear. So my second question is regarding the updates on the recent changes from the Secretary of Energy, especially the increase in the contracting limit to 60% for existing spot thermal starting in April 2027. How is that going for you? How much you have already contracted and how do you expect that to evolve in 2027? And just a quick one regarding the Sterka capacity auction that is taking longer than expected. Do you have some information there and also in the Fonibem privatization process?
Fernando Bonnet
Chief Executive Officer
Going to the first one, right now we reach the limit of 20% that the former regulation established and we are looking to increase that for sure for the next year. Reaching the 60%, we are seeing that difficult without entering a contract with the distribution companies. I think we could reach perhaps 10%, 15% more the next coming year. but reaching the 60% of our thermal capacity, we will need to enter in a contract with distribution companies that are, as you know, or requires additional regulation in terms to maybe pass through of those contracts to the demand and that's required for for the Sur Federal Regulation and for the rest of the distribution companies, a provincial regulation, a local regulations in order to, as I mentioned, to have this pass through directly to the demand working without the delays that they need to have right now, following every contract they signed to this to this new scheme and it requires, as I mentioned, automatic schemes that are not set right now. So we expect to increase, but to reach the levels of the new regulation will require time and a new regulation for the distribution companies. And the last one, talking about CERCA, I don't know, we talk every week with the authorities and they are working in order to have this process established at least at the end of the year and try to move forward at the beginning of the next one. But I don't know, we don't have a certain timeline for that. We expect to, if not this end of this year, we expect for the first quarter, next one. and the same of Honey Prioritization. We are talking every week and they say that they are ready to launch, but they still have some approvals and some paperwork, but we don't have also a clear time.
Tomas Peruchin
Analyst, Balance
Okay, thank you very much. And my last question is, on the oil and gas side, how is the process of building your team going? You mentioned that you are preparing the rig application. Could you share a bit more about your development plans for the blocks, especially the expected timeline for the exploration activities? Thank you very much.
Fernando Bonnet
Chief Executive Officer
Well, as you mentioned, we are building the team. We are stronger than the team every day, so we We are setting the challenge of the most important position and challenging right now. And in terms of RIGI, we are working very hard with the lawyers and all the team in order to have all the documentation ready to present or to apply to RIGI as soon as possible. So we are expecting this for this year or the beginning of the next one. when we have all the information ready. In terms of declaration, first, as I mentioned, we need to reach the CENCH for Aguadal Chivato and Boca Rey, and then we are expecting to move forward perhaps first quarter next year or early second quarter next year.
Tomas Peruchin
Analyst, Balance
Okay, thank you very much.
Operator
Conference Call Operator
Thank you. Our next question comes from Mateus Tostos with City. You can open your microphone.
Mateus Tostos
Analyst, Citi
Hi, thanks for taking my question and congratulations on another good set of results. My question is on the oil and gas side. So you reported some capex disbursements of some 55 million in the results yesterday. I was just wondering if you could share some color on what that was for, specifically if it was still payment for Aguada de Chivato, Boca Rey or... and many more. Justo Pedro Sáenz, Maria Laura Feller and their development points to a potential production of 50,000 barrels per day I know it's still early to gauge the potential on any of the blocks but I was just sharing if you're thinking of something in that magnitude and if that was the case if you would be willing to bring a partner to help you develop that block yes those would be my questions thank you
Fernando Bonnet
Chief Executive Officer
Okay, thank you for your questions. Talking about the expenditures that you mentioned, this was the acquisition of the block, and not yet any development ready in that area, so it was the acquisition of the Chivatam of Array and Cost. And as we talked earlier, we are planning to present, we're working hard to present the The same requirement and the REED for end of this year early for half a quarter. And then after that, we are planning to enter in an exploration phase for Aguadal Chivato and Boca Rey. And then if we enter in a REED regime, we need to spend at least 240 million dollars in the next So this was more or less the capital expenditure that was paid for the areas. And talking about Corralera, as you mentioned, it's very early stage to say what is possible or the potential of the area are, but As you mentioned, if everything goes as we expect and the implementation information that we saw when we evaluate the area goes well, it will be more or less the same Possible production, as you mentioned, of Geopark are expected. So we are seeing more or less in the situation that we confirm all the information that we saw would be some of this, as you mentioned. and that level of production whenever it was fully developed. So for Corralera, it's an earlier stage than Chivato, so we signed an agreement for exploration with the Neuquén company and we have an agreement for to drill three wells in four years to the risk of the area. So we are planning to enter in that exploration phase next year. And then after that, we will see if we can go to Okay, thank you.
Mateus Tostos
Analyst, Citi
And just to follow up, and you would be willing to look into partnering with an operator to develop Corralera and potentially also Chivato and Bocarei?
Fernando Bonnet
Chief Executive Officer
No, in fact, we are developing our own resources. We have an agreement with a very well-known company that works in the U.S., in Permia, that is Radius Energy, and they are working with us in order to develop and to operate the areas by ourselves.
Mateus Tostos
Analyst, Citi
Okay, thank you. Thank you very much, and congratulations again.
Fernando Bonnet
Chief Executive Officer
Thank you.
Operator
Conference Call Operator
Thank you. Our next question comes from Martín Arancet. Could you give us more color on the 4Q26 majored maintenance at Centro Costanera? If I'm not mistaken, when did you have the last majored maintenance on the asset? And how much capex would this majored maintenance require?
Fernando Bonnet
Chief Executive Officer
Okay, thank you Martín for your question. The previous major maintenance was in 2000, the previous year was a big maintenance on the GT number 8 and the boiler was a big intervention of the boiler that this Unit never asked, so the boiler was at the original stage, so we did a major intervention of the boiler and the GP number eight. And this time was the time for the GP number nine intervention, so we changed the hot parts of the steam turbine. We made an engraving of the hot parts of the steam turbine, sorry, of the gas turbine. And we don't expect a new Thank you. Our next question comes from Ramiro Guerreiro. Thanks for taking my question and congratulations on the results.
Operator
Conference Call Operator
What capex should we expect for Q4 and for 2027? And on the costanera combined cycle overhaul, how much will it cost and how long will the unit be offline? Thank you.
Fernando Bonnet
Chief Executive Officer
Well, talking about the electricity part, we are finishing our base Patril Systems Storage Projects, and at the end of the year, at the beginning of the next quarter. So in that sense, we are not expecting new growing CapEx, at least until that we don't see the new thermal option. So that will depend on if we get awarded on that option or not, but right now we are finishing the expansion Capes of the storage system projects. So we are not expecting additional ones. As I mentioned, aside from new awarding of the CERCA capacity auction. I'm talking the normal maintenance will be, as I mentioned, we are not expecting big maintenance of the units, so it will be the regular maintenance Capes. And in oil sector, as I mentioned, if we enter in a really big scheme, we will see that 240 million in these two next years, perhaps separating a half year and year. And that's, aside from acquisitions and new awarding projects, it will be more or less how the cap is to be.
Operator
Conference Call Operator
Thank you. We have a couple of questions from Alejandro Christensen with Latin Securities. How much of second Q26 and third Q26 EBITDA came from margins on self-procured LNG and liquids? Do the new CVP caps reduce that margin going forward? In your view, what's the government intention in accelerating contracting for legacy units and moving liberalization up to 2029? Do you expect MAD B2B contract prices to come down? Can you give guidance on contract prices per megawatts, including fuel? What's the drilling timeline and deadline for the Corralera Noroeste commitment and the plan at PESA? Would you consider a partner farm down or selling the average once it's the de-risked?
Fernando Bonnet
Chief Executive Officer
Well, a lot of questions going one by one. Talking about the fuel margin or the fuel earnings, the full year we were around between 7 million and 75 million. We are not expecting a reduction, talking about the resolution 293. In fact, the margin will be reduced, but we are expecting the DGS transportation that we require, so that gives us an opportunity to make a more margin in terms of FRA regulation. So that will compensate the reduction and also the agreement that we reached with Luz Petrol. So I think this reduction of margin that's coming from the resolution 283 will cover for the increase of margin coming from the self-procured gas to Petrol and others that we are expecting. to enter in new agreements and the additional margin that we would capture and having a film transportation grant from DGS. So we expect more or less a compensation around that. And for sure, depending the final number for the next year, depending on how cold the winter can and how much energy that we can We can use and procure. Going to the other one, what is the government intention in accelerating the contractualization? I think one big point or a big topic for the government is the spike in prices that spot consumers, especially commercial consumers and small industries consumers, They are willing to encourage new contractualization and in the other part of that they need to release energy for new contractualization. The 20% is not enough to contractualize all the residential, sorry, commercial and industrial facilities. and users. So in that sense, the government allowed to increase that we can go and try to contractualize those customers that suffer big spikes during winter. But as I mentioned, reaching the 60% is higher even with those customers. So on top of that, we need to reach, if we want to reach that 60%, we need to go to the distribution companies and not have that regulatory issue that we mentioned in previous questions. And the last one, I think that we already talked about it for Aleda and Oroeste, we reached an agreement of Four years of exploration with three wheels that we need to do in order to risk the area. And in Bayside is different, as you mentioned, we are not in the, in that we are going to enter Nessage directly, so that will be a different, different, Thank you very much for the answers.
Operator
Conference Call Operator
This concludes our Q&A session and I would now like to turn the conference back to Mr. Fernando Bonnet for his closing remarks.
Fernando Bonnet
Chief Executive Officer
To wrap up, this was another quarter of a strong execution for Central Puerto. We delivered solid financial results, continued to strengthen our commercial position, maintained a disciplined balance sheet, and made meaningful progress across our strategic role initiatives. Looking ahead, we are focused on bringing our battery storage project into operation on a scale advancing to the development of our newly acquired back-and-forth assets and pursuing new business expansion opportunities to create long-term value for our shareholders while preserving financial flexibility. I would like to thank our people for their commitment, our customers and business partners for their trust, The financial sector and our shareholders for their continued support. See you soon. Thank you for joining us today. Operator, we can disconnect.