newcleo Q3 F2026 Earnings Call Transcript
AI Conference Call Analysis
Sign in or subscribe to read.Conference Operator
Operator
Hello and welcome everyone joining Nucleo's Q3 2026 business update call. At this time, all participants are in a listen-only mode. Later, you will have the opportunity to ask questions during the question and answer session. To register to ask a question at any time, please press star 1 on your telephone keypad. Please note this call is being recorded and we are standing by if you should need any assistance. It is now my pleasure to turn the meeting over to General Counsel Khalil Bukhari. Please go ahead.
Khalil Bukhari
General Counsel
Thank you and welcome everyone to Nucleo's first call as a public company where we will provide a quarter three 2026 business and preliminary financial update. For those of you who don't know me, I'm Khalil Bukhari, the General Counsel. Joining me today is Stefano Bolo, our co-founder and chief executive officer, and John Stransky, our chief financial officer. A copy of today's presentation is available on our investor relations website at investors.nucleo.com. We've included a convenience translation into US dollars for various metrics. These were calculated using exchange rate as of September the 30th, 2026 of $1.1355 to the euro. Today's call will also contain forward-looking statements that refer to future events and involve some risk. We encourage you to review our filings with the SEC for additional information on factors that could cause actual results to differ materially from our current expectations. I'll now send the call over to our CEO, Stefano Buono.
Stefano Buono
Co-Founder and Chief Executive Officer
Thank you, Khalil, and welcome to everyone joining us on our call today, our first as a public company. We are thrilled to be here today to discuss our strategic vision, our technical advantages, commercial plan, business and preliminary financial update, and our operational progress. At the outset, I'd like to recap our recent financing activities, our balance sheet, and our go public process. we are excited to complete our business combination with new world investment core three on september 21 and to begin trading on nasdaq under the ticker symbol nwcl on september 22. the transaction provided 247 million us dollars in gross proceeds including 216 million from our pipe investors and 31 million from the trust account at closing We were pleased that the pipe was oversubscribed and by the quality of the investors who participated. Alongside supportive financial investors, we were particularly pleased by the number of strategic partners and potential commercial customers who chose to invest, a list of whom is available in our findings. We see their participation as a strong validation of our technology and our path to commercialization. In addition, we have secured $19 million of further private financing since May, unrelated to the business combination, bringing the total private capital we have raised since our founding in 2021 to more than $1 billion. These funds will support our growth in the U.S. and Europe as we advance our lead-cooled fast vector and MOX fuel production toward commercialization. before we turn to our recent progress i want to briefly recap what we do for those who joining us for the first time nucleo is a generation for nuclear technology company and what sets us apart is simple to our knowledge we are the only company with a business model combining lead cooled fast reactor development and deployment with in-house mixed oxide or marks of fuel fabrication our business rests on three core offerings the first is our lead cold fast reactor or lfr which is designed to maximize inherent safety operates at near atmospheric pressure and high thermal efficiency enabling emission free safe modular and competitively priced basal power The second is mixed oxide or mock fuel fabrication, which recycles plutonium and other materials from spent reactor fuel into new fuel, reducing nuclear waste while providing a secure long-term fuel supply. This fuel can be used in one of our lead-cooled fast reactors, as well as other fast reactors and even light water reactors. Lastly, beyond our reactor and fuel strategy, we have built a platform of revenue-generating subsidiaries spanning engineering, manufacturing, testing services, and project delivery. We own several companies which anchor our supply chain and give us control over access to specialized reactor components. Our approach is not to invent new physics, it's to scale and industrialize what already works. We deliberately chose technologies with decades of European operating and research experience. Fast reactors and inlet cooling, which are designed to enable intrinsic safety at reasonable cost, and mock fuel, which enables multi-recycling of nucleus and fuel. I also want to stress that every single picture you will see today in the presentation was taken in our facilities with other people and almost all components in the pictures are designed and built by us. Behind our technology is a substantial industrial organization. From day one we have structured the company to execute. We made acquisitions to secure critical components of the supply chain, supporting on-time, on-budget delivery while generating revenue ahead of reactor deployment. We invested early at our Brasimone Research Center to address the historical technical challenges of lead current, qualify our solutions for licensing and operations, and accelerate training and commissioning. and we pursue the diversified commercial strategy to reduce deployment risk we have more than 900 employees and our footprint spans 17 locations across seven countries including five of our own factories development sites and dedicated design and qualification training centers Our team brings decades of leadership in lead-cooled technologies and double intellectual properties protected by 36 patent families. What's important is that we are a revenue-generating company today. Our vertically integrated subsidiaries generate nearly 40 million in revenue per year, supporting clients across the globe. The global trends are firmly in our favor. According to the International Energy Agency, electricity demand is expected to double by 2050, driven by data centers, electrical vehicles, electrification, and new technologies. At the same time, governments are putting nuclear back at the center of their energy strategies. The United States alone is targeting a four-fold increase in nuclear capacity by 2050. The question is no longer whether the world needs more nuclear, it's who can deliver it. Now, this is where our technology comes in. Our lead-cooled SAS reactor is a Generation IV advanced modular reactor cooled by liquid lead and powered by MOX fuel or recycled spend nuclear fuel. We believe lead cooling gives us four things. First, inherent and passive safety. lead operates at ambient pressure and is chemically inert so unlike sodium there is no reaction with air or water and the risk profile of any potential incident is fundamentally reduced second design simplification which lowers structural cost because we do not need to engineer around the failure modes that other currents create third high operating temperature which opens up industrial applications beyond electricity, heat for chemicals, steel, cement, and four, potential for co-location due to reduced emergency planning zones. Now the fuel. Mixed oxide fuel is a reactor fuel composed of depleted uranium oxide and the plutonium oxide that is extracted from spent nuclear fuel. we believe mox gives us several advantages of its own it maximizes the energy extracted from spent fuel because the overwhelming majority of the available energy is still there it creates a supply security and potentially lowers fuel cost because our feedstock is material that today is treated as a liability rather than an asset it enables multi-recycling which pairs with fast reactors what's interesting about MOX is that it can fuel multiple types of reactors including sodium fast reactors and light water reactors that makes our MOX capability reactor agnostic rather than built to suit only our own reactors so it can help power the nuclear renaissance well beyond nuclear zone operations This closed loop fuel ecosystem is one of nuclear's key differentiators and will allow spent nuclear fuel to be recycled again and again as fuel for our reactors. We talk about the benefits, but I wanted to emphasize the importance of providing a secure alternative fuel supply. Uranium supply today is highly concentrated. according to the world nuclear association about 75 percent of the world's uranium comes from just four countries and russia accounts for roughly 40 percent of global enrichment capacity china's growing role reinforces the challenges according to the u.s energy information administration from 2016 to 2024 china's nuclear capacity grew 76 percent with nearly 37 reactors under construction uranium prices have already risen at a 16 percent compounded and ungrowth rate between 2017 and 2025 and it is only expected to get worse our management estimates based on various consulting partners and public data that between 2023 and 2050 china's uranium demand will increase between four and six times and by 2050 china's share of global demand will reach approximately 40 percent taking control of price out of our hands Reducing reliance on other countries for fossil fuels and the rich uranium is an imperative and legislators in the US and Europe realize this. France is already an expert on recycling MOX. We believe about 40% of France reactors are licensed to use MOX. And MOX generates roughly 10% of French nuclear electricity. Our closed loop approach insulates us from geopolitical tensions and gives us long-term supply security we have talked about the technologies advantages and importance of fuel independence but i'd be remiss not to go deeper on the commercial applications that our lfr technology opens up because our reactor produces high temperature steam it can also serve a wide range of industrial needs So our customer base is not limited to data centers and hyperscalers. With our European footprint, our engineering depth, and the ability for our reactors to deliver both electricity and heat safely, we are already working with partners across several industries, in steel with Danieri, in cement with Cementir, and in chemicals with Maire Tecnimum. Some of these partners are also shareholders aligned with us for the long term with a belief in our technology and path to commercialization our focus on the maritime sector is also exciting we are working with many partners in maritime including fincantieri and saipan nuclear is also leading a consortium with bureau of editors marine and offshore and abmi group on and floating a project selected under bpi france or for project to decarbonize the french maritime sector over roughly 18 months the team will develop the concept of design for a non-self-propelled nuclear barge housing multiple lfr reactors each producing 200 megabit electrics to supply reliable low carbon power to ports industrial hubs coastal areas and isolated regions as well as energy intensive use like desalinization and low carbon fuel production our positioning in the maritime application is critical because our technology is uniquely suited to the sea in a worst case scenario such as sinking the surrounding sea water would pull the lead until it solidifies encasing the core and helping retain radioactive material Combined with a compact modular design built in a factory-like shipyard environment, this gives floating nuclear a safety profile that conventional reactor designs can't easily match at a price per megawatt that should be advantageous to terrestrial designs. Our pipeline today which john will review later is a balanced mix of data center and industrial players and we are thrilled to be leading the conversations in maritime application we have taken an iterative approach to developing our first of a kind reactor with each stage building on the learning of the last after having these many test facilities for different validations at brasimone we built hotel back in 2025 a 2 megawatt thermal non-nuclear test loop designed to validate the performance of our reactor's main components, the pump, the steam generator, and the fuel assembly. Otello was built in the last seven months of 2025 and became operational in 2026. And since then, we are running a wide range of test cases to qualify our design and solutions, to develop our standards and operating procedures using the same equipment that will be used in our first-of-a-kind reactor. Our next critical milestone is the completion of the construction of Precursor, also at Brasimone in Italy. Precursor is a 10 MW scaled lead-cooled reactor. It is non-nuclear, with a core heated by electricity rather than nuclear fuel, but it uses the same critical components and architecture as our first-of-a-kind reactor. While Othello allowed us to validate individual components, we believe Precurso will allow us to operate them together as an integrated system for the first time in a system with complexity similar to a commercial reactor. we will be able to study startup and shutdown procedures and postulated accident scenarios on real equipment under real operating conditions and develop the operating and safety procedures our teams will use in our commercial reactors we made strong progress on site the core simulator is now installed alongside the main vessel steam generators primary lead pumps and decay heat remover By year end, we expect to complete all construction and begin melting the lead that will fill the system. We plan to begin commissioning in December and expect to complete it by mid-2027. After precursor, our next major event is the opening of our MOXFUEL facilities. John will discuss milestones to get to that event. From a mox perspective, we are pursuing two sites in parallel, one in France and one at the Savannah River site in the United States. We expect to complete construction at the first site by 2031. On the LFR side, while we are pursuing many prospects, we expect to reach commercial operation of our first of a kind reactor in 2032. we are evaluating multiple options for its location including the united states and are pursuing additional opportunities for subsequent reactors in slovakia lithuania and france in slovakia we have established a joint venture with yaris to develop our 200 megawatt electric reactors on the boom chair retired reactor site each of these projects as a robust set of work streams, including site selection and permitting, regulatory manufacturing and operation and safety. We look forward to updating you as we progress. I am confident we have the right team to execute, as they have already shown with Otello and Proposal. What's critical here is that Otello and Precursos are not science projects. They are purpose-built to validate the main components of our first-of-a-kind reactor. Testing at this scale serves several purposes at once. It generates experimental data that supports our licensing application, giving regulators evidence drawn from real hardware rather than models alone. It also allows us to identify and resolve engineering issues now, when changes are far less costly, rather than during construction of our first nuclear plant, and it gives our teams hands-on experience operating an electrical system before nuclear fuel is ever introduced. What matters even more is that the hardest part of nuclear is not the science, it's execution and operation. Our team has done this before, and we have furthered the risk through this industrial approach. Our team has entirely designed, procured, and built both Otello and Precursor, including the main components that will be used in our first-of-a-kind, leveraging our own supply chain. For example, the steam generator installed in Precursor is a component designed by Nuccio and built by the Nuccio subsidiary Fucine. and will be the same design installed in our first of a kind and future reactors we have acquired a group of subsidiaries that generate revenue today and bring capabilities that help us build hotels are helping us build precursor and that supported dozens of other clients across the nuclear industry each brings something distinct srs provides engineering services for nuclear plant design project management and safety analysis. Fucina specializes in nuclear decommissioning and in the manufacturing components for liquid lead system. And Rucci is a leading supplier of specialized nuclear-grade pumps to the broader industry. Lastly, Bonifay-Pesage, our latest acquisition, builds nuclear-grade scales and precision weighting equipment, critical to advanced fuel manufacturing These businesses are operating at scale. In fact, Rucci, which just celebrated its 80th anniversary, has more than 5,000 pumps across 100 nuclear plants worldwide, roughly half of them in France, and SRS and Fucina have commissioned more than 25 liquid-led facilities. I hope this gives us a clear picture of both our technology advantages and the deliberate, disciplined way we have gone about commercializing them. From choosing proven technology to integrating our own supply chain to validating our designs on real equipment, every decision has been made with one goal in mind, delivering, not just designing, our first reactors safely, on schedule, and at scale. Now, before I turn it over to John for our preliminary financial update, I want to walk you through some additional highlights from the past several months, starting with the reactor side. From a reactor pipeline perspective, I'm pleased to share that our latest stage pipeline has grown to 10 gigawatts. John will provide more detail on our commercial plans momentarily. Moving to the fuel side, we have inaugurated our FASTER Center in October, which stands for Fuel Process Sustainability Storage Training and Announce Reality Center in France. FASTER provides advanced engineering, prototyping, testing, and immersive training capabilities for nuclear smog filtering, which is comprised of around 100 engineers and highly qualified specialists. The Center provides a dedicated non-nuclear environment to develop test and qualify technologies, equipment and processes for future MOX fuel fabrication and operations. We have seven test facilities operating at the site covering key stages of the fuel fabrication process from powder dosing and pellet pressing to fuel assembly and quality inspection. Moving to our progress with the Department of Energy, in May, the DOE selected Nucleo, together with our partner Okro, for advanced negotiation under the surplus plutonium utilization program, alongside four other advanced and neutral companies. The program aims to make designated surplus plutonium available to industry and enable its conversion into fuel for advanced nuclear reactors. subject to us security safeguards and material rentability requirements the selection based on our strategic partnership with oclo announced in october 2025 to develop advanced fuel fabrication infrastructure in the united states together with oclo we have had several joint site visits to savannah river and we submitted our formal application We continue to await the next update from the DOE. Continuing on the fuel side, we announced an agreement with Curio to collaborate on the use of recycled spent fuel materials for the production of fuels for advanced reactors. The Curio arrangement, together with our previously announced SHINE agreement, make up important pieces of our US fuel strategies as we firm up the feedstock supply chain. Today, the United States has no commercial reprocessing of spent fuel, while roughly 97,000 metric tons of it sits in storage at reactor sites across the country, growing by about 2,000 tons every year. Our work with Okno on surplus government plutonium gives us a near-term source of materials. Our partnerships with Coolio and Shine complement that by opening a long-term pathway to the much larger results of commercial spent fuel, turning one of the industry's biggest liabilities into fuel for our reactors. Moving on to recent highlights across our supply chain and corporate operations. We completed the acquisition on Bonifay-Pisage. precision weighting is essential to the safe handling and accounting of nuclear materials and this acquisition secures in-house access to equipment that MOX fuel facilities will require further strengthening our vertical integrated capabilities we continue to build out our supply chain operations and we fucinia locus are one of many components we can build in our supply chain and this one we intend to also use in our first of kind together with other patterns because few suppliers make logbox building this capability internet is important finally it's plc plc plc plc plc william is the current director general of the oscd nuclear energy agency and the former nrc commissioner as vice chairman i hope this has given you a clear sense of both our technical differentiation and the rapid progress we are making towards commercialization plc plc plc plc plc plc Each of these steps brings us closer to our first-of-a-kind reactor and to our mock facilities. With that, I'll turn it over to John Stransky, who will talk through our key milestones in more detail, provide a preliminary financial update, and share our outlook of what to expect as we move forward. John?
John Stransky
Chief Financial Officer
Thank you, Stefano, and good morning and good afternoon to all of you joining us. I'm thrilled to provide a bit more detail on our progress as well as preliminary financial update and our expectations. I won't go through every project in our deployment pipeline in detail, but slide 18 has an update on each of the projects we've announced previously. As you'll see, we're pursuing several opportunities in parallel. For today, I want to briefly recap the regulatory milestones we have underway in the United States and in France, starting with our LFR technology. In the U.S., in July, we submitted our regulatory engagement plan, or REP, for the LFR-AS-200 to the U.S. Nuclear Regulatory Commission. That plan sets out our licensing approach and the schedule for our interactions with the NRC. We subsequently submitted the first batch of pre-licensing deliverables in early October and are now awaiting the NRC's feedback in preparing for the next submissions. Our next tranche of submissions will be in 2027 on various qualification programs. We expect this process will be iterative and extend into 2028 for various topical areas. We continue to explore and finalize site locations. In France, we are also awaiting feedback from the ASNR on its review of our LFR-AS30 reactor safety features. For the next steps, we are preparing a complementary submission for the LFR-AS200 specifics and future construction permit application. On the MOX fuel side, in the US, we submitted our REP for the Aiken, South Carolina fuel facility on August 6th. That plan frames our pre-application work with NRC staff ahead of licensing. Project licensing for the US fuel facility also continues through planning and alignment with our other project development activities focused on the Savannah River site. In France, In July, we're pleased to receive the satisfactory opinion from the ASNR for the safety features of our French MOX plant. Our next step is to submit a design assessment for construction. Our regulatory process remains ongoing, and we will continue to provide updates in the future when we make material progress. Before I go further into the numbers, I want to frame how this business will monetize as we move into fleet-scale deployments. It's not a single revenue line, and it's deliberately CapEx-like. We expect to have four core revenue streams per reactor, all related to our strong IP foundation and vertically integrated subsidiaries. First, reactor licensing, an upfront pre-commercial operation date, or COD, IP license fee for our proprietary lead-cooled fast reactor. This is one time in our model, but may result in additional licensing and upgrade fees later. Second, services and equipment. pre-cod site development engineering specialized equipment sales and operator training sales of critical reactor components from our vertically integrated subsidiaries are expected to be 60 to 70 percent of this also one time but a much larger ticket third ongoing maintenance liquid lead focused maintenance and replacement components across a 60-year operating life recurring fourth mox fuel The initial fuel load plus ongoing refueling, again across 60 years, recurring. Then alongside those, two forms of ownership. We plan to take 20 to 100% equity in the early LFR and MOX projects. We believe this ownership structure does three things. It de-risks the first deployments, it lets us prove the project economics with our own capital at stake, and it captures the equity upside rather than handing it to someone else. as our manufacturing and EPCM subsidiaries give us technical depth plus real first-of-a-kind revenue today. As we scale the business, we expect to translate the reactor business to one of licensing and building for off-takers with little to no long-term ownership on the reactors, helping us scale in a capex-like form. However, we very much like the economics on MOXFUEL and would expect to own a sizable share of the fuel economics in the long run. The point of this page, We expect two one-time revenue streams that get us paid before commercial operation and two recurring streams that get us paid for six decades after. One of the most exciting areas of progress is our pipeline of commercial partners. Our team has invested significant time into building a rigorous, multi-step process for qualifying commercial opportunities. The process takes each opportunity from strategic lead identification through qualification, commercial fit, feasibility, and a proposed term sheet. all the way to negotiation and execution. That discipline means that the opportunities we count as later stage are thoroughly vetted, not simply early stage leads. That process is delivering results. At our mid-September update, we had about 9 gigawatts of later stage opportunities. I'm pleased to share that we now have 10 gigawatts in later stage opportunities with a total pipeline of about 27 gigawatts, including top-of-funnel pre-pipeline. We continue to cultivate the relationships that are furthest along. Italy is a good example of our momentum. In September, the Italian Parliament approved a bill instructing the government to define the regulatory and legislative framework for reintroducing nuclear energy. That expanded the aperture of our pipeline, and we are very well positioned to capitalize on opportunities in Italy. In that context, we're thrilled to sign an MOU with an Italian site developer partner, and that project is now part of a later stage pipeline. The next step will be to pursue feasibility studies for this project, including the engagement with the appropriate stakeholders. Our pipeline is also diversified by end market. More than half comes from industrial customers seeking both electricity and or heat, where we can provide clean, reliable baseload powder for the energy transition. The other half comes from high growth data center clients with a strong willingness to pay. Geographically, the pipeline spans six countries, About three quarters of the pipeline is in Europe, across France, Italy, Slovakia, Belgium, and Lithuania, and about a quarter is in the United States. We're really excited about the U.S. opportunity ahead of us as we begin building a U.S. team to grow the pipeline in the United States. Before we turn to our preliminary financial update, I want to highlight the unique opportunity we have with MOX. MOX is not a new or unproven fuel. Today, it's used mainly in light water reactors and other fast reactors. Our fast reactors are designed to run entirely on MOX, turning plutonium recovered from spent nuclear fuel into a valuable energy source. Unlike conventional uranium fuel, MOX doesn't depend on enrichment, which is one of the tightest and most geopolitically concentrated parts of the nuclear fuel supply chain. That's expected to shield us from both the enrichment bottleneck and the rising uranium prices. We expect MOX sales to be one of our key revenue streams, and we expect our MOX to be highly cost-competitive. While the figures on this slide are illustrative, what matters most is our independence from uranium costs relative to our peers. As we discussed earlier, uranium prices have risen sharply over the past several years, and that pressure is only expected to increase as global demand grows. Because MOX is made from recycled plutonium and depleted uranium and requires no enrichment, we're largely insulated from those rising costs. As we estimate MOX production costs at around $5 million per ton, We believe we can sell it for 8 to 14 million per ton. This range implies margin of approximately 40 to 65%. Demand per reactor is substantial. A single reactor could consume approximately 150 tons of MOX over its 60 year life. Our production also scales efficiently. One facility producing 40 tons of heavy metal a year could supply the annual fuel needs of approximately 17 200 megawatt reactors. We're very enthusiastic about the prospect of MOX sales particularly because mox is already an industrially proven commercial fuel moving to the financial update from q3 all figures are in euros comparing q3 2026 with q3 2025 we have also included the 2026 value in dollars on the side as a convenience based on the exchange rate as of the last day of the quarter revenue was 10 million euros this represents a 26 increase year over year The increase was driven primarily by engineering services in Romania, followed by sales of components for liquid lead systems. From a geography perspective, the biggest growth came from clients in Italy and Asia. We were able to allocate more of our capacity to external third parties this year compared to prior year, when most of our capacity was consumed by the development build of Othello and Precursor.
John Stransky
Chief Financial Officer
Other income, mainly R&D tax incentives and grants in France and Italy, was 2.9 million euro.
John Stransky
Chief Financial Officer
This represents a 75% decline compared to Q3 2025, driven by the completion of a prior year grant. We continue to pursue additional grants and tax incentives, which we expect to benefit this line in the future. This type of grant funding is a recurring feature of companies in our stage of development in this industry, and we expect additional opportunities to be made available. In Q3, we used approximately 13 million euro in operating activities and approximately 12 million euros in investing activities. Investing included approximately 11 million euro of capital expenditures, a nearly 2 million euro decrease compared to our prior year. The funds were primarily for our R&D and experimental facilities in Italy and France, inclusive of investments in the FASTER Center. Financing activities benefit from foreign exchange fees provided by approximately 191 million euro of net cash, including 217 million euro of gross proceeds from our equity race. Our free cash flow for the quarter was approximately negative 24 million euro. As we move forward, we expect our cash burn, our proxy for free cash flow, to increase over the coming quarters for a few reasons. First, spending will step up meaningfully once we begin investing in our MOX fuel facility, which we expect to do after securing the plutonium award from the U.S. Department of Energy and securing a land agreement. Second, we're investing heavily in feasibility studies to advance our deployment pipeline. Third, our operating costs will rise as precursor our prototype EBRASIMONI comes online. Some of this spending depends on government milestones. Independent of those milestones, however, we will continue research and feasibility work in parallel as we prepare to launch project deployment. As we execute against our milestones, we will evaluate additional financing requirements, prioritizing strategic and non-dilutive structures. We ended the third quarter with 20.5 million euro of debt and 233 million euro of cash and equivalents. Let me also take a minute to discuss our capital structure since this is our first quarter as a public company. As of September 30 in 2026, we had approximately 281.5 million ordinary shares outstanding and 340.2 million fully diluted shares including earn out securities. The fully diluted shares outstanding $297 million remain subject to lockup, of which approximately $233 million expire in March 2027. On the balance, earlier release for certain holders are tied to share price. Finally, a note on our forward purchase agreement. Subsequent to the end of the quarter, we notified the counterparty of our decision to terminate the agreement. As a result, the 7 million shares subject to the agreement that are included in our 281.5 million shares outstanding will be returned to the company. Looking ahead, we've several near-term catalysts. First, completing our precursor demonstrator, which we are on track to do by the end of 2026. Second, finalizing an award with the Department of Energy to secure plutonium from the US government's surplus stockpile. As we mentioned earlier, we've made meaningful progress on this together with Oklo. Third, secure a land agreement for the US box facility, enabling site-specific lease licensing. Progress MOUs towards a commercial agreement with about 800 megawatts in negotiation and exclusivity already. And fifth, continue to advance our regulatory engagement with the NRC in the U.S. and ASNR in France. We look forward to sharing more as these progress. Before we open the line to questions, I'll leave you with this. At Nucleo, we're bringing market technologies demonstrated over decades of research and industrial programs and pairing them with a business model built to close the nuclear fuel cycles. We're excited about the progress we've made and even more excited about what's ahead. With that, operator, please open the line for questions.
Conference Operator
Operator
Thank you. If you'd like to ask a question, press star 1 on your keypad. To leave the queue at any time, press star 2. Once again, that is star 1 to ask a question, and we'll pause for a moment to allow everyone a chance to join the queue. and we'll take our first question today from Seth Basham with Wedbush Securities. Your line is now open.
Seth Basham
Analyst, Wedbush Securities
Thanks a lot, good morning, and nice to talk to you guys. My question is really around the step up in burn for 2027. Could you quantify that for us, excluding and including the MOX plant capex?
John Stransky
Chief Financial Officer
Hey Seth, John here. we don't give forward-looking guidance on our cash burn but but I would say you know the step up would be tied to completing the you know the the feasibility studies and and sorry the feasibility studies and investing in the facility after we secure the plutonium from the Department of Energy So it's really tied to continuing to do the development of those, continuing to work on the milestones of developing the project itself.
Seth Basham
Analyst, Wedbush Securities
Understood. That's fair. And on that DOE surplus plutonium award, what's the expected timing of that?
John Stransky
Chief Financial Officer
So the timing is, the conversations are ongoing with the DOE. It's, we've had numerous engagement with Oklo and with the DOE. And in May of this year, we were announced as being in advanced stages of negotiation with Oklo for the award of that surplus plutonium.
Seth Basham
Analyst, Wedbush Securities
And one more, if I may, just on the economics and the capital commitments split with Oklo on that major project.
John Stransky
Chief Financial Officer
Uh, well, so what we've talked about previously was, uh, the, the CapEx for the mock facility could be in the range of, uh, two to 3 billion. Um, but the, uh, the project would be funded of course, with a combination of, of, uh, non-dilutive sources of financing, such as tax credits, grants, loans, um, as well as potential equity contributions from our partners.
Seth Basham
Analyst, Wedbush Securities
That's helpful. All right, I'll turn it over. Understood. All right, thank you very much, guys.
Conference Operator
Operator
Thank you. And once again, if you'd like to ask a question, please press star and 1 on your keypad now. We'll go next to Joseph Osha with Guggenheim Securities. Your line is now open. Good morning.
Peyton Durand
Analyst, Guggenheim Securities
Good morning. sorry this is peyton durand on for joe osher this morning um i guess just a question related to the plutonium award sort of a follow-up there i guess if that award's coming before the land agreement how much lead time is there if that award is potentially delayed pushing up the cod date for the u.s mox facility and i guess how should we think about timing related to the land agreement um what's the latest you could realistically start site work on the mox facility while still delivering a first fuel assembly by target date of 2031 and then i have a quick follow-up thanks
Stefano Buono
Co-Founder and Chief Executive Officer
yes this is uh stefano nice to meet you um um of course uh we cannot really disclose the discussion on the plutonium award there are a lot of details but i can say that these are not generating any delay to the target of the end of 2031 at the moment our big focus at the moment is really securing the land because this will allow us to start the licensing process the one and a half year licensing process that we already engage with the nrc not officially but in a pre-licensing period we are meeting with the nrc essentially every week and we are providing a lot of white papers and topical reports both for the mock facility and the reactor so one one week is the director the week after is uh is the mock facility so the engagement is very high and but really hope to to give uh news as soon as we can deliver great that's uh very helpful and then i guess of the 800 megawatts in negotiation exclusivity is there a specific project progressing along the expected sign first and are we getting close to a definitive announcement coming on that thanks That's very difficult to anticipate because we are going in parallel on on different options so it's it's very difficult because. Of course, progress on such huge projects are articulated, I would say.
Peyton Durand
Analyst, Guggenheim Securities
Thanks guys turn it back. And once more, if you'd like to ask a question, please press star and one on your keypad now.
Conference Operator
Operator
And at this time, I'm showing no further questions in queue. I will now turn the meeting back to Stefano for closing remarks.
Stefano Buono
Co-Founder and Chief Executive Officer
Well, I'd like to thank you again for all of you joining us today. on our first call as a public company we will be present in different investor conferences in the coming weeks and please refer to our website for details i also want to thank our more than 900 employees for their hard work and our partners customers and shareholders for their support and confidence We remain focused on what matters most for us, delivering, not just designing our first reactors safely on schedule and at scale. And thank you again, and have a good day.
Conference Operator
Operator
Thank you. This brings us to the end of today's meeting. We appreciate your time and participation. You may now disconnect.